PDR Business Setup and Operation – Introduction

Back to Contents

PDR Business Setup and Operation – Introduction

This set of modules is a basic summary of the business plans put in place for the PDR operation. Discussed in subsequent modules are the operational structures and possible approaches, steps and considerations as you enter the storm zone. The possible layouts are also discussed and together with an insight in attempting to make the correct decision making procedures.

The steps involved with the storm event are:

  • – setting up the business
  • – the pre-storm preparations
  • – entering the storm zone
  • – layout of available premises
  • – setting up the premises
  • – operating in the storm zone
  • – closing down the premises